A pioneering research facility, planned with lcmd

GSI - The mega construction project FAIR

Kunden Logo

Sector

Industry

Area

Research institution

Project duration

2017 - est. 2028

Project volume

150.000 m²

GSI Helmholtzzentrum für Schwerionenforschung

Before we can show you YouTube videos, we must inform you that data may be sent to the provider when you watch the videos.

Special features of the projec

Accelerator ring tunnel (particle accelerator)

  • 17 meters deep below the ground
  • 1100 meters circumference and 40m width
  • 2 Mio. m3 of earth will be moved
  • 600,000 m3 of concrete will be used
  • 65,000 tons of steel will be used
  • 1580 Employees and over 3000 researchers from 50 different countries
No items found.
GSI Helmholtzzentrum für Schwerionenforschung

Lean Manager | Projekt FAIR

Markus Schwerdtfeger

The clarity provided by lcmd is very helpful for us. An example: We now transfer the structuring of the buildings to each of the 25 buildings. With analog pegboards, we don't even need to imagine this in the control system.