SWECO GmbH on behalf of DEGES

Expansion of the B1 to a six-lane A40

Kunden Logo

Sector

Critical Infrastructure

Area

Public Transport

Project duration

2021 - 2027

Project volume

9,5 km

Before we can show you YouTube videos, we must inform you that data may be sent to the provider when you watch the videos.

Unique project highlights

The 13 structures along the route will be partially replaced, partially renovated, or adapted to current conditions. For the most part, these are bridge structures, such as the bridge over the Emschertalstraße. However, a subterranean tunnel has also been adjusted as part of the project. The noise protection measures which are planned along the expansion are intended to keep noise and exhaust emissions away from residents. Some of these noise barriers will already be installed during the route expansion to protect residents from construction noise.

No items found.

Senior Project Manager | Drees & Sommer SE

Ricci Münchenbach

With lcmd, all construction processes are presented clearly - this allows problems to be detected and resolved early on.