On-schedule and quality-assured implementation of 6,400 square meters of floor space for medical training

Teaching building Medical Campus University of Augsburg

Project Stats

Project duration

2021 - 2024

Project volume

Industry

Real Estate

Area

Commercial Construction

Healthcare

Project overview

Project name: New teaching building for the Faculty of Medicine

location: Medical Campus, University of Augsburg

Project volume: First building of the 78,000 sqm campus

Completion: October 2024

Usable area: 6,400 sqm

BGF: 13.985 m²

Building height: 32 meters

Project management and start-up management

  • Technical project management since May 2021
  • Start-up management for complex medical technology systems
  • Technical monitoring during construction
  • Coordination between Augsburg State Building Authority and the project participants
  • Quality assurance during the handover phase
No items found.

Project description

The teaching building marks the start of Augsburg University's new medical campus and is in close proximity to the university hospital.

As the first building on the planned 78,000 square meter campus, it forms the basis for combining theoretical education and practical medicine.

Core functions of the building:

  • Lecture rooms for up to 1,500 medical students
  • Modern seminar and internship rooms
  • Medical Library of Augsburg University Library
  • Interprofessional training center (Skills Lab)
  • Dean's Office of the Faculty of Medicine
  • Institute for Didactics and Training Research

Technical challenges

Complex building technology

The teaching building required the integration of the latest medical technology infrastructure. Coordination between various trades and compliance with medical standards placed particular demands on project management.

Start-up management

  • Systematic review of all technical systems
  • Coordination of approvals between client and contractor
  • Documentation of handover processes
  • Ensuring on-time operational readiness

Special features

Architectural concept

The 32-meter high building with its characteristic ceramic façade made of red glazed ceramic rods sets a distinctive accent and acts as a counterpart to the neighboring university hospital.

Combining theory and practice

The proximity to the university hospital enables an optimal connection between theoretical education and clinical practice — a central component of the Augsburg model study program in human medicine.

Project partners

architecture: BHBVT Society of Architects mbH, Berlin

Landscape architecture: Studio Polymorph

Construction version: Augsburg State Building Authority

Project management: Drees & Sommer (lcmd) - Technical Project Management and Monitoring

Discover how lcmd can make your company more efficient too.